GEODIS – Fos-sur-Mer
Your mission, should you choose to accept it: move three 2,000-ton floaters from the docks of Fos-sur-Mer all the way offshore!
Our client GEODIS took on the challenge and brought us on board for one of the most ambitious floating wind projects ever imagined in the Mediterranean.
Capturing this operation was no easy task:
Unpredictable weather
A highly secured site
Multiple camera angles running simultaneously
This film tells the story of the complexity behind the operation and the logistical precision required to turn this colossal project into reality… all while keeping our feet (and our cameras) dry and safe!